Maharashtra has a state grid of 400 W the details of which are as follows :
- Koradi to Bhusawal 1 400 KV-Single circuit line using two conductors for each phase.
- Bhusawal-Babaleshwar : 400 V-Single circuit line using two conductors for each phase.
- Babhaleshwar to Padaghe 1 Single circuit.
- Babaleshwar to Dhule Double circuit.
- Koradi to Chandrapur 1 Single circuit.
- Parall to Karad Single circuit.
- Chandrapur to Parti Single and double circuit.
- Padaghe to Kalwa Single circuit with two conductors per phase.
- Karad to Lonikand : Single circuit.
- Parali to Lonikand : Single circuit.
- Lonikand to Kalwa 1 Single circuit.
- Lonikand to Padaghe to Kalwa Single circuit
Inter state grid
Maharashtra and Madhya Pradesh
- 400 kV single circuit : 400 kV single circuit 400 KV double circuit : 220 kV double circuit : 132 kV double circuit 132 kV double circuit
- Koradi-Bhilal : 400 kV single circuit
- Koradi-Satpuda : 400 kV single circuit
- Chandrapur-Bhital : 400 KV double circuit
- Ambazari-Satpuda : 400 KV double circuit
- Bhusawal-Chandni : 400 KV double circuit
- Kanhan-Pench : 400 KV double circuit
Grid between Maharashtra and Gujarat
- Nasik-Navasari : 220 kV double circuit
- Tarapur-vapl-Navasari : 220 kV double circuit
Maharashtra-Karnataka, Goa etc.
Kolhapur-Belgaum : 220 kV double circuit
Kolhapur-Tillari-Fonda-Goa : 220 kV double circuit
Chandrapur-Ramgundam : 400 kV double circuit
765 k
V PROJECT
765 kV corridor is to be established with substations at Koradi and Akola with 1260 km of two single circuits of 765 kV lines between Tiroda to Nagpur and Aurangabad by 2012-13 for evacuation of power from Koradi and Adanl generation projects. The corridor will terminate in power grid’s 765 kV substation at Aurangabad.
Brief details of works :
- Establishment of 765 KV Pooling S/S at Koradi and Akola with 7 X 500 MVA, 765/400 kV single phase transformers.
- Construction of 400 kV loop lines at Koradi and Akola substations to interconnect with 765 KV station. Construction of 2 x 765 KV single circuit lines between :
- Tiroda-Nagpur (Koradi)
- Koradi and Akola
- Akola and Aurangabad