Need of Parallel Operation of Alternators and Condition for Satisfactory Parallel Operation

Need of Parallel Operation of Alternators and Condition for Satisfactory Parallel Operation.  Q. Why the alternators  are connected in parallel ?  What are the conditions to be fulfilled  successful parallel operation of alternators? Need of parallel operation of alternators and condition for satisfactory parallel operation : Load growth : Load demand is now a days … Read more

Tests to be Carried out on Transformer Under Routine Tests and Special Tests

Tests to be Carried out on Transformer Under Routine Tests and Special tests Q. Enlist any four tests to be carried out on transformer under routine tests and special tests. Routine Tests :  Measurement of D.C. Resistance of Winding Measurement of Voltage Ratio and Check of Voltage. Vector Relationship  (Polarity Test and Phasing – out … Read more

Types of Fire Extinguishers

Types of Fire Extinguishers Q. Which types of fire extinguishers are in your institute state their locations. Types of Fire Extinguisher Many types of fire extinguishers are available with different extinguishing ‘agents’ to deal with different classes of fires. Water-filled extinguishers: There are two methods of operation. Gas cartridge type Stored pressure type With both … Read more

Conditions for Parallel Operation of 3Φ Transformer.

Conditions for Parallel Operation of 3Φ Transformer. Q. State various conditions for parallel operation of 3Φ transformer. Conditions : Voltage ratings of the primary windings should be suitable for supply system voltage and frequency.  The windings must be properly connected as regards their polarities.  Voltage ratings of primary and secondary of both transformers must be identical … Read more

Specific Test Before and After Commissioning of Transformer

Specific Test Before And After Commissioning of Transformer Q. List the specific test before and after commissioning of transformer. 1. Mechanical tests 2. Electrical tests THESE RULES MUST BE FOLLOWED FOR ALL TEST PROCEDURES. Following is an approximate sequence for transformer testing: 1. Inspect transformer and parts for shipping damage and moisture. 2. Check nameplate … Read more